TM 11574A-OI
2-16
III.
PRE-OPERATING PROCEDURES
2-10. General
This section contains theory of operation, startup, normal operation and shutdown procedures for
the Large Field Refrigerated System and associated components.
Two personnel are the minimum number recommended to safely and efficiently setup the Large
Field Refrigerated System (LFRS).
2-11. Fluid and Lubrication Requirements
Check oil sight glass for oil level range, with the compressor off, oil level should be between the
bottom and one-eighth level of the sight glass. Add Castrol Icematic oil as necessary.